Welcome to Linuo Group!HomeBusiness License
  • CN

  • WeChat

  • Mobile Site

  • Search

登录入口资讯

Successful ignition of C1# furnace at Linuo Technical Glass

2017.03.26

After technical upgrading, Linuo Technical Glass’ C1# furnace was put into operation on March 20. Installed in September 2014, the furnace had been used to produce low borosilicate pharmaceutical glass tubes with air combustion technology. In January 2017, LTG began the technical upgrading and the air combustion system was to be replaced by the more eco-friendly and energy-saving oxygen combustion system, which can at the same time improve the quality stability of LTG’s products and reduce the emission of hazardous substances. Besides, the furnace is connected with an automatic detection - tube feeding - piling - palletizing system, which shall greatly enhance the per capita productivity and lay a solid foundation for the sustainable development of the company.